2470 East Helen Street: 190426-Fri

TODAY’S STATUS

The temporary retaining wall was completed. They fill-in the spaces between the dead soldiers with 2″ x 14″(?) boards trimmed to fit in the I-beam channels. They start at the top, secure the trimmed boards with bent nails, and then dig down to place the lower boards. In all, the retaining wall was 13+’ high.

1 thought on “2470 East Helen Street: 190426-Fri”

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top